preloader

PACKING MATERIAL COST PER BATCH DURING YEAR 2011-12

Packing Material (PM) cost study for formulation

Name of the company

Address of the Registered Office and Factory

S. No Name of the packing
material with description
Unit Existing rate
per unit (Rs.)
Quantity required
per batch
Value of packing
material per batch (Rs.)
(1) (2) (3) (4) (5) (6)
1

--

--

--

--

--

2

--

--

--

--

--

3

--

--

--

--

--

4

--

--

--

--

--

5

--

--

--

--

--

--

Total

--

--

Process Loss as per norms

--

--

Total packing material cost

--

--

Packing material cost per pack = Total PM cost / Number of pack as per batch size

 

Signature of Company Authorised Signatory

Signature of Charterd Accountant/Cost Accountant